Skip to content

Robot Preparation

Wiring Checklist

  • Follow good electrical practices.
  • Hot glue wires.
  • Zip tie loose wires.
  • Cut the POE wire inside the ethernet cable between the VH-109 and RoboRIO/SystemCore.
  • Make sure all wires are secure, do a "tug test" on each one to ensure nothing will unplug in the event of a collision.
  • Use a voltage tester to check for resistance and ensure the robot complies with inspection rules.

Software Checklist

  • Make sure the master branch that will be used in competition isn't modified.
  • Push the code that will be used in competition, and maybe add a tag to it so it's obvious what should be used.
  • Make sure cameras are operational and calibrated.
  • Make sure swerve is aligned properly.
  • Do a full systems check with a "drop test."

Mechanical Checklist

  • Clean cameras with lens wipes, and cover for transport if needed.
  • Check for any breaks or bends, replace parts if needed.
  • Replace worn wheels and drivetrain tread.
  • Vacuum the inside of the robot, mystery dust is bad for electronics.